Over the past few days I have been making slowly but surely progress with patching the Viking up for her move to Goodwood sometime later in October. Opening up the decking had some unexpected side effects. On a positive side the wet soaked rotten timber has slowly dried out and wiht this the Viking has lost some weight and has come out of the water a little bit. On the not so positive side the timber beams have now become brittle and some of the beams have disintegrated. and a section on the port side collapsed. - Danger - Authorised Personnel only- Over the past week thus we have been busy constructing an internal frame to support deck beams and the decking itself. Soon we will be ready to install a temporary plywood decking. As always Franklin has been greeting us with mostly the best weather. |
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. Archives
July 2019
Categories |